Skip to primary navigation
Skip to content
Skip to footer
Home
About Us
Advantages
Contact
Subscribe
Login
Cost of Returned Concrete per Year
Ready Mix Concrete Supplier
Name
Required Name
Email
Required Email
Company Name
Required Company Name
Plant Location
Required Plant Location
Amount of Concrete Produced per Year at this Plant
yd3
Required Concrete Volume
Avg Pour Size
yd3
Required Avg Pour Size
No. of Pours per Year
ea
Avg Hourly Rate of Truck Driver
$
Required Avg Hourly Rate of Truck Driver
Avg Truck Washout Time for Clean-up Load
min
Required Avg Truck Washout Time
Avg Cost to Dispose of Returned Concrete at Landfill
$
/ yd3
Required Avg Pour Size
Avg. Concrete Return (Waste) %
%
Required Avg. Concrete Return
Avg Amount of Concrete Returned per Pour
yd3
Avg Cement Sack Content per Yd3 of Concrete(sacks/yd3)
Required Avg Cement Sack Content
Continue
Ready Mix Concrete Supplier
Cost to Dispose of Material Returned per Year
Cost of Truck Driver Washout Time for Clean-up Load
Total Cost of Returned Concrete per Year
Cost of Returned Concrete per yd3
Total Tons of CO2 Released per Year of Returned Concrete
Back
Continue
Total Potential Yearly Savings
Ready Mix Concrete Supplier
Potential Savings if Use the MUDRIGHT System
Yearly Cost Savings
Saving per yd3 Produced
Yearly Tons of CO2 Savings
Potential Concrete Return Rate
Potential Avg yd3 Returned per Pour
Potential Truck Washout Time per Pour
*Estimate based upon fully automated MUDRIGHT System
Back
Finish